Turbodan 15150712, Y.O.M 2012, Hours run 3106
This trailer drier went through our refurbishment workshop where it was put through our 27-check point process to ascertain any repairs needed. The trailers electrical, heating & cooling, hydraulic, brake and fuel systems were all tested. Work carried out on the trailer included,
- Hydraulic couplings replaced.
- New PTO shaft cover fitted.
- Full set of stirring augers replaced.
- Stirring auger motor replaced.
- Missing safety guards fitted.
- Drive belts replaced and tensioned.
- Guide rollers and bearings replaced where necessary.
- Mesh drying floor fully replaced.
- New stainless furnace burner tube fitted.
- Gearbox oil changed and trailer fully greased.
- Control panel repainted.
- Worn air seals replaced.
Farrell F1575, Y.O.M 1997, Hours run 282.08
This trailer drier went through our refurbishment workshop where it was put through our 27-check point process to ascertain any repairs needed. The trailer’s electrical, heating & cooling, hydraulic, brake and fuel systems were all tested. Work carried out on the trailer included,
- All 4 Tyres replaced.
- New PTO shaft fitted.
- Missing safety guards fitted.
- Drive belts replaced and tensioned.
- Guide rollers and bearings replaced where necessary.
- Gearbox oil changed and trailer fully greased.
- Control panel repainted.
- Worn air seals replaced.
NEW Irrimec ST6 110/450 Irrigator
- Galvanised chassis and turret
- Double supply pipe
- Electric shut off
- Full hydraulics
- Dosidis control with GSM
- Beacon end warning
- Konkord vari angle raingun
- 50mm towing eye
- 400/15.5 wheels
£27,705.00 plus VAT, ex-works


